New Tactics for Stabilizing Fukushima
New Tactics for Stabilizing Fukushima
  • Korea IT Times
  • 승인 2011.05.18 13:30
  • 댓글 0
이 기사를 공유합니다

Fukushima reactor schematic

Tokyo Electric Power Co.'s strategy for cooling the Fukushima nuclear reactors has been revised, the utility announced Tuesday. Rather than flood the reactors with fresh water, Tepco will build a circulation system that flushes water through the pressure vehicle, decontaminates it and then pumps it back in, The Washington Post reported.

Despite the revision, the company still expects to stabilize the plant within six to nine months. The utility was forced to overhaul cooling plans after learning of a substantial meltdown in the plant's unit 1 reactor. Fuel pellets collected at the bottom of the pressure vessel, burning small holes or cracks in the containment that allowed for the leaking of coolant. Damage to the unit 1 building from the March earthquake and tsunami became clear only last week when engineers fixed a gauge that measured water levels, the Post said.

For weeks Tepco had said that the fuel rods in unit 1 were 60 percent cover by water but it turned out that they were fully exposed. The meltdown at the Fukushima plant was the worst nuclear incident in a quarter century. Some 80,000 residents were forced to flee homes within 12 miles of the plant.



댓글삭제
삭제한 댓글은 다시 복구할 수 없습니다.
그래도 삭제하시겠습니까?
댓글 0
댓글쓰기
계정을 선택하시면 로그인·계정인증을 통해
댓글을 남기실 수 있습니다.

  • #1206, 36-4 Yeouido-dong, Yeongdeungpo-gu, Seoul, Korea(Postal Code 07331)
  • 서울특별시 영등포구 여의도동 36-4 (국제금융로8길 34) / 오륜빌딩 1206호
  • URL: www.koreaittimes.com / m.koreaittimes.com. Editorial Div. 02-578-0434 / 010-2442-9446. Email: info@koreaittimes.com.
  • Publisher: Monica Younsoo Chung. Chief Editorial Writer: Kim Hyoung-joong. CEO: Lee Kap-soo. Editor: Jung Yeon-jin.
  • Juvenile Protection Manager: Yeon Choul-woong. IT Times Canada: Willow St. Vancouver BC, Canada / 070-7008-0005.
  • Copyright(C) Korea IT Times, Allrights reserved.
ND소프트