Hyundai Mipo Builds Its First-ever LEG Carrier
Hyundai Mipo Builds Its First-ever LEG Carrier
  • By Oh Hae-young (info@koreaittimes.com)
  • 승인 2015.07.20 09:48
  • 댓글 0
이 기사를 공유합니다

Hyundai Mipo Dockyard announced on July 17 that it has built the first-ever LEG carrier.

On the same day, the Korean shipbuilder held a christening ceremony for the first time in a series of five LEG carriers ordered en bloc in September 2013 by a Greek owner Eletson.

The LEG carrier was named “Othoni” after a Greek island by a daughter of the shipowner. This ship was built in about 10 months after the steel cutting began in September 2014.

The Othoni features a length of 147.0 meters, a width of 22.6 meters and a depth of 12.6 meters, with three cargo tanks which have a combined capacity of storing 12,000 cubic meters of liquid ethylene gas.

The cargo tank is made of nickel steel materials which can endure very low temperature. The cargo tank has a heat insulation structure to transport liquid cargoes safely even at the temperature of 104 degrees Celsius below zero.


댓글삭제
삭제한 댓글은 다시 복구할 수 없습니다.
그래도 삭제하시겠습니까?
댓글 0
댓글쓰기
계정을 선택하시면 로그인·계정인증을 통해
댓글을 남기실 수 있습니다.

  • #1206, 36-4 Yeouido-dong, Yeongdeungpo-gu, Seoul, Korea(Postal Code 07331)
  • 서울특별시 영등포구 여의도동 36-4 (국제금융로8길 34) / 오륜빌딩 1206호
  • URL: www.koreaittimes.com / m.koreaittimes.com. Editorial Div. 02-578-0434 / 010-2442-9446. Email: info@koreaittimes.com.
  • Publisher: Monica Younsoo Chung. Chief Editorial Writer: Kim Hyoung-joong. CEO: Lee Kap-soo. Editor: Jung Yeon-jin.
  • Juvenile Protection Manager: Yeon Choul-woong. IT Times Canada: Willow St. Vancouver BC, Canada / 070-7008-0005.
  • Copyright(C) Korea IT Times, Allrights reserved.
ND소프트